Work is progressing well with the construction of the 2 storey extension at the rear of the main hall. This will replace to "Den" and the tent drying area, also enclosing all the open areas between the main hall and the Stores. The pictures below show initial installation of the main steel-work to support the structure.

IMG 0148

This shows the main "front to back" steels, linking the main building to the stores. Note the Den and tent drying area is still intact underneath at this stage!

IMG 0150

This picture shows the "A Frame" attached to the lower steels to form the upper storey end-wall. Further pictures below.

IMG 0149

IMG 0152

 

 

 